Installation skills of ceiling in kitchen and toil

2022-07-22
  • Detail

Generally, the installation of kitchen and bathroom ceiling needs to be done after the installation of pipes. The vibration can be reduced by installing the aluminum gusset ceiling in the correct order. The correct installation order in the bathroom is to install the Yuba and exhaust fan first, and then make the aluminum gusset ceiling. Then the following editor introduces the installation skills of the ceiling in the kitchen and bathroom

generally, the installation of kitchen and bathroom ceiling needs to be done after the installation of pipes. The vibration can be reduced by installing the aluminum gusset ceiling in the correct order. The correct installation order in the bathroom is to install the Yuba and exhaust fan first, and then make the aluminum gusset ceiling. Then the following editor introduces the installation skills of the ceiling in the kitchen and bathroom

1. Don't drill too deep

the key to kitchen and bathroom ceiling is to grasp the discretion in the construction process, that is, when fixing the drilling hole, don't drill too deep. In the past, there have been such cases in construction. Drilling too deep may damage the original waterproof capacity and cause endless trouble. Therefore, it is recommended to keep 3-4cm when drilling

2. The installation sequence should be correct

the correct installation sequence of kitchen and bathroom ceiling can reduce unnecessary vibration. The correct installation sequence in the bathroom is to install Yuba and exhaust fan first, and then make the ceiling. Never install the exhaust fan or Yuba directly on the aluminum gusset plate with screws, and use expansion bolts to directly hang it on the top concrete; If the exhaust hose of the exhaust fan is relatively long (more than 1 meter), it is best to let the worker fix it on the top, otherwise, the exhaust pipe will vibrate when the exhaust fan is turned on. The fixing method is very simple, and you only need to use transparent tape to fix it

the correct sequence for the installation of kitchen ceiling should be to fix the hose of the range hood and the flue, select the location of the range hood at the other end, and buy the lamps used in the kitchen, but it is not necessary to install them first, then install the ceiling, and then install the lamps. It is best not to install large lamps directly on the ceiling

3. Arrange the plate shape and color in order according to the construction drawing

when installing the keel, determine the direction of the keel according to the design direction of the ceiling measurement construction drawing. After determination, mark the keel distance line and drilling point on the roof, and drill with electric hammer. The drilling depth should not exceed 4 cm, so as to prevent damaging the embedded wire pipe in the wall. After the punching is ready, expand the matching inner expansion into the hole. According to the height of the corner, saw the galvanized copper wire, put it into the internal expansion, cut the keel according to the length of the room, and fix the keel on the copper wire with nuts. When laying the ceiling, the shape and color of the plate should also be arranged in order according to the measurement construction drawing. When arranging the plate, the gusset plate should be tight and seamless with the corners, and the control line hole should be marked

4. When transporting and stacking, pay attention to the flatness of the plates

when purchasing the kitchen and bathroom ceiling, the aluminum gusset plate, plastic steel plate or integrated ceiling and the supporting keel and accessories should meet the product quality requirements, and be sure to check whether there is bending deformation. In the process of transportation and stacking, the plates should be laid flat, not under pressure, and avoid the erosion of high temperature and harmful substances. The keel should be flat during installation, and the spacing deviation should be controlled within the allowable range. During installation, if there is a deviation in size, it should be adjusted first and then inserted in sequence. It is not allowed to insert hard to prevent deformation

the relevant information about the installation skills of the ceiling in the kitchen and bathroom is introduced here. I hope this article is helpful to you. If there is anything else you don't understand, you can leave a message to Xiaobian below, and we will answer it for you as soon as possible

classification of material selection for gypsum board ceiling

how to install gypsum board ceiling installation flow chart

how to select integrated ceiling selection skills

advantages and disadvantages of selecting light steel keel for ceiling

贵阳皮肤病医院

沈阳男科医院

南宁男科医院

南昌男科医院

Copyright © 2011 JIN SHI